Loss means tree cover was removed: clearing, but also plantation harvest or fire. It is not a finding of illegal deforestation, and the data is yearly, not monthly.
Permits
Visible with a free account · Permit list and numbersSign in
Needs: Metadata Indikator TPB (Bappenas) + RAD TPB per province/regency
Not connected yet
Trend per indicator (on track / moderate / stagnating / decreasing)
Needs: Yearly series of the axis A indicators
Not connected yet
Mercury / ASGM sites (unconfirmed signals)
Visible to trusted partners
Reclamation gap (disturbed minus reclaimed)
Visible with a free account
Abandoned mining land still bare or water (5+ years)
No data for this subject
Estimated mining effect per target (DiD / synthetic control)
Needs: Control areas (matching) + yearly series
Not connected yet
Permit change history (ESDM diff)
Needs: Weekly comparison of the ESDM permit register
Source is empty
Pollution part of the affected area
Needs: Pollution part of the affected area (water, sediment and air measurements); only the physical footprint is measured today
Not connected yet
Sources
Kementerian ESDM geoportal (Minerba / Monaresia Wilayah Pertambangan), via legacy Eco Mining Data harvest · geoportal.esdm.go.id · retrieved 18 Oct 2026 · signal · unknown
Eco Mining Data computation: current permit geometries (ESDM) × area; overlap with WDPA protected areas · computed by Eco Mining Data · as of 18 Oct 2026 · signal · derived from the ESDM permit layer and WDPA (WDPA terms apply)Union of current permit geometries clipped to the subject; intersection with protected-area polygons; geodesic area
Eco Mining Data computation: mining footprint (Cheng et al. 2026 · Maus et al. 2022 · ESMI digitised) × subject; inside and outside current ESDM permit geometries · doi.org · computed by Eco Mining Data · as of 31 Dec 2019 · signal · derived from Cheng et al. 2026 and Maus et al. 2022 (CC BY-SA 4.0), ESMI digitised land and the ESDM permit layerFootprint polygons clipped to the subject (geodesic area), counted once where sources overlap (Cheng > Maus > ESMI); the part inside the union of current permit geometries vs outside known permit boundaries (ESDM). Outside is not a finding of illegality: it can be a data gap or an older permit.
Cheng et al. 2026 · Mining land-use classes inside global mining polygons (South-Eastern Asia) · doi.org · as of 31 Dec 2022 · signal · CC BY-SA 4.0
Maus et al. 2022 · Global-scale mining polygons (Version 2) · doi.org · as of 31 Dec 2019 · signal · CC BY-SA 4.0
Hansen Global Forest Change GFC-2025-v1.13 · glad.earthengine.app · as of 31 Dec 2025 · confirmed · CC BY 4.0Hansen, M. C. et al. 2013. High-Resolution Global Maps of 21st-Century Forest Cover Change. Science 342: 850-53. Data: Global Forest Change 2000-2025 (v1.13), University of Maryland.
KLHK Onlimo water-quality monitoring, via legacy MI · retrieved 18 Oct 2026 · signal · unknown
Sentinel-5P TROPOMI tropospheric NO2, KNMI TEMIS monthly means v1.0 (0.125°): enhancement over a local background · www.temis.nl · as of 1 Sept 2026 · signal · Copernicus Sentinel data, free and open with attributionMean of the newest 12 months (at least 6) over a local background; strongest of the regency mean and its industrial zones; a column density, not a ground concentration
Eco Mining Data computation: distance from each permit polygon to the nearest Global Mangrove Watch polygon (CC BY 4.0), search radius 50 km · www.globalmangrovewatch.org · computed by Eco Mining Data · as of 18 Oct 2026 · signal · derived from Global Mangrove Watch (CC BY 4.0) and the ESDM permit layerStraight-line distance between polygons; proximity, not a measured effect
Eco Mining Data computation: schools (Dapodik, OpenStreetMap, Overture) and health facilities (Kemenkes SIRS, OpenStreetMap, Overture) within 5 km of the mapped mining footprint · computed by Eco Mining Data · as of 20 Oct 2026 · signal · public reference data / ODbL 1.0 / CDLA-Permissive-2.0Straight-line distance from each facility to the nearest mapped mining footprint polygon; proximity, not measured exposure
Visible with a secured profile · Export (PDF, CSV, KML, GeoJSON)Sign in
From this mine to the industrial park that most likely processes its ore, on to the port, the export and the buyer. What we know, what we infer and what we cannot see are kept apart.
No processing sites known for this metal yet
For kaolin we do not yet know the processing sites, so no chain can be drawn. Nickel is covered first.
Export, buyers and ships need a key
These stages stay empty until a key is in place. We show the gap instead of guessing.
UN ComtradeYearly exports by product and destination country.Waiting for a key
What was promised in public documents, next to what the satellite measures on the same land.
No sourced promises are registered for this permit or its holder yet. Nothing is assumed: a promise appears here only after it was quoted from a public document and checked by a second reviewer.
Reclamation plans, PPKH obligations, reforestation commitments, sustainability-report targets and zero-deforestation pledges are measured against the recovery status and the forest-loss record of the same land.
How this is measured
A promise is a quote of a public document: the source link and its SHA-256 are shown, and it appears here only after review by a second person.
Delivered is the gain in revegetated land since the year of the promise, from the yearly land-cover maps (MapBiomas, to –) on the footprint polygons of the permit or company. Land that is mined again counts against it.
A per-year plan is multiplied by the years in its period. If the deadline lies beyond the data, the amount due is the linear share up to the last data year, and the state is on pace or behind, never missed.
The grade compares delivered with due: A from 90%, B from 70%, C from 40%, D below. The range follows the promise year plus or minus one year, because the maps are yearly.
A zero-deforestation pledge looks at tree-cover loss (Hansen, to –) in the years after the pledge year: A none, B within the noise (1 ha or 0.1% of the tree cover), C up to 1%, D more.
Next to the grade you see the mined land today, new tree-cover loss and how much land was opened versus reclaimed. Before and after frames come from the time machine.
A grade compares a number in a document with a number from space. It does not judge intent or legality.
Pulse
Is something happening on this site now? Several weak signals side by side, each with its own age and grade. An indication, never proof.
Active this week?
Not enough data to say
No live signal source is switched on for this site yet: radar, night light and fire are waiting for access keys. Records and yearly data cannot show what is happening this week.
Heartbeat: the last 12 weeks, from 27 Jul to 12 Oct. One beat per week. An open dot is a week without a reading, not a zero.
No index yet: it needs at least one live signal or one register record in the last 12 weeks.
Area context (monthly)
Air above the area (NO₂)Sentinel-5P column enhancement over the nearest industrial zone or the regency. Describes the place, not this permit.Place, not this permit
freshD-0 ×10¹⁵ molec/cm² lately, +7% against the months beforenewest month September 2026
Long-term direction (yearly)
New mined landYearly growth of disturbed land inside the permit (MapBiomas life history).
no data
Tree-cover lossHansen yearly loss inside the permit (clearing, but also harvest and fire).
yearlyC1.6 ha in the last 3 years, +80% against the 3 years beforecovers up to 2025; not this week
Long-term direction: rising From yearly data only; it says nothing about this week.
Live signals (weekly)
waiting for access key4 sources wait for an access key: Radar change, Night light, Fire hotspots, Ships at the jetty. An administrator switches them on.
Radar changeSentinel-1: ground disturbance seen through cloud.
waiting for access keyNeeds a free access key from Copernicus (Sentinel-1). Get the key ↗For the operatorSet CDSE_CLIENT_ID + CDSE_CLIENT_SECRET in the worker environment, set MI_PULSE_SCHEDULE=1 and restart the worker; the lane then fills by itself.
Night lightVIIRS: light over the site after dark.
waiting for access keyNeeds a free access key from NASA Earthdata (VIIRS). Get the key ↗For the operatorSet EARTHDATA_TOKEN in the worker environment, set MI_PULSE_SCHEDULE=1 and restart the worker; the lane then fills by itself.
Fire hotspotsNASA FIRMS: satellite fire detections inside the permit.
waiting for access keyNeeds a free access key from NASA FIRMS. Get the key ↗For the operatorSet FIRMS_MAP_KEY in the worker environment, set MI_PULSE_SCHEDULE=1 and restart the worker; the lane then fills by itself.
Ships at the jettyAIS: vessel-days at the site's jetty.
waiting for access keyNeeds a free access key from aisstream.io. Get the key ↗Set AIS_API_KEY in the worker environment, set MI_PULSE_SCHEDULE=1 and restart the worker; the lane then fills by itself.
Records (weekly)
Eco Watch incidentsIncidents placed on this permit.
members only
Register changesStatus, validity or boundary changes in the permit register.
no datanothing recorded in the last 12 weeks
News mentionsArticles linked to this permit.
members only
An indication from public satellite and register data. It is not a production figure and not proof of legality. Yearly data gives a direction, never a verdict for this week. An open dot means no reading.
For the operator
Who owns this
From the permit to the company behind it, and from there to the group above it. Every link shows where it comes from and how sure we are.
Registered holder
PT Sandeir Setia BrothersConfidence C
PT
Holder since 18 Oct 2026
The name in the official permit register. That is not always the company that owns the business.
Beneficial owner (the people behind it)
Not available
The beneficial owner register of the Indonesian company authority (AHU / OSS) is only open under a formal agreement. Until then we do not guess names.
Ribbon thickness shows the stake where we know it. Dashed means a weaker or unstated link. A name is shown only for companies: natural persons are never named here.