Value after restoration in Indonesia
Restoring the abandoned mining land that is still bare or water could bring a net gain of Rp 2.61 tn on the MapBiomas mining-class measure. This page shows where that gain lies, who would benefit and how sure we are.
Restoring the abandoned mining land that is still bare or water could bring a net gain of Rp 724 bn on the footprint measure.
Model estimate, not an appraisal.
Model restorevalue.v1, run of 20 October 2026.
Recovery status after mining ›
The restoration opportunity in rupiah
Both measures side by side. They overlap and are never added together.
Every 30 m pixel that MapBiomas ever labelled as a mining pit and that is now abandoned and still bare or water.
- Land counted
- 36,760 ha · abandoned, still bare or water
- Payback
- 2 yrs
- Gain per rupiah of cost
- 0.88×
Land inside the mapped mining footprint polygons that is abandoned and still bare or water.
- Land counted
- 16,097 ha · abandoned, still bare or water
- Payback
- 2 yrs
- Gain per rupiah of cost
- 0.65×
Model estimate, not an appraisal. tn = trillion, bn = billion, m = million (rupiah). The letter after a figure is its grade (A best, D a rough model estimate); the range is P10–P90.
By permit zone
Where the land lies against the ESDM permit layer. Inside an expired or revoked permit, the former permit holder still has a reclamation duty.
| Permit zone | MapBiomas mining-class measure | Footprint measure | ||
|---|---|---|---|---|
| Land | Net gain | Land | Net gain | |
| Inside an expired or revoked permit: reclamation duty applies | 85 ha | Rp 6.17 bn | 50 ha | Rp 4.26 bn |
| Inside an active permit | 13,607 ha | Rp 799 bn | 10,364 ha | Rp 453 bn |
| Inside a permit with another statusPending, suspended or unknown status. | 3,020 ha | Rp 112 bn | 177 ha | Rp 9.37 bn |
| Outside known permit boundaries (ESDM)This can be a gap in the ESDM permit layer or an older permit: the layer lists current permits only. | 20,048 ha | Rp 1.69 tn | 5,505 ha | Rp 263 bn |
| Indonesia | 36,760 ha | Rp 2.61 tn | 16,097 ha | Rp 724 bn |
“Outside known permit boundaries (ESDM)” can be a gap in the permit layer or an older permit. It says nothing about who is responsible.
Bangka Belitung, Kalimantan and Sulawesi
| Region | MapBiomas mining-class measure | Footprint measure | ||
|---|---|---|---|---|
| Land | Net gain | Land | Net gain | |
| Bangka Belitung | 4,223 ha | Rp 204 bn | 825 ha | Rp 39.5 bn |
| Kalimantan | 20,993 ha | Rp 1.46 tn | 14,323 ha | Rp 648 bn |
| Sulawesi | 1,073 ha | Rp 46.8 bn | 110 ha | −Rp 381 m |
Provinces with the largest net gain
| Province | MapBiomas mining-class measure | Footprint measure | ||
|---|---|---|---|---|
| Land | Net gain | Land | Net gain | |
| Kalimantan Tengah | 8,504 ha | Rp 744 bn | 3,399 ha | Rp 179 bn |
| Kepulauan Riau | 4,788 ha | Rp 584 bn | – | – |
| Kalimantan Timur | 7,052 ha | Rp 541 bn | 7,123 ha | Rp 421 bn |
| Kepulauan Bangka Belitung | 4,223 ha | Rp 204 bn | 825 ha | Rp 39.5 bn |
| Maluku | 1,101 ha | Rp 117 bn | 9.9 ha | Rp 160 m |
| Kalimantan Selatan | 3,145 ha | Rp 99 bn | 3,278 ha | Rp 91.6 bn |
| Riau | 877 ha | Rp 97.9 bn | 126 ha | Rp 5.87 bn |
| Kalimantan Barat | 1,754 ha | Rp 92.4 bn | 108 ha | Rp 437 m |
| Sulawesi Tengah | 735 ha | Rp 50.4 bn | 3.4 ha | Rp 357 m |
| Kalimantan Utara | 538 ha | Rp 45.5 bn | 416 ha | Rp 23.7 bn |
| Nusa Tenggara Timur | 171 ha | Rp 22.6 bn | 0.6 ha | Rp 81.8 m |
| Maluku Utara | 119 ha | Rp 18.6 bn | 66 ha | Rp 9.44 bn |
Top 15 kabupaten
By net gain
| Kabupaten | Land | Net gain |
|---|---|---|
| 1. Kabupaten Kotawaringin TimurKalimantan Tengah · iron ore | 3,189 ha | Rp 376 bn |
| 2. Kabupaten KatinganKalimantan Tengah · coal | 2,328 ha | Rp 230 bn |
| 3. Kota BatamKepulauan Riau · quarry | 1,416 ha | Rp 230 bn |
| 4. Kabupaten BintanKepulauan Riau · tin | 1,868 ha | Rp 191 bn |
| 5. Kabupaten Kutai KartanegaraKalimantan Timur · coal | 2,394 ha | Rp 179 bn |
| 6. Kabupaten Kutai TimurKalimantan Timur · coal | 2,336 ha | Rp 150 bn |
| 7. Kabupaten KetapangKalimantan Barat · bauxite | 951 ha | Rp 111 bn |
| 8. Kabupaten BerauKalimantan Timur · coal | 1,046 ha | Rp 93.2 bn |
| 9. Kota Tanjung PinangKepulauan Riau · commodity unknown | 586 ha | Rp 72.5 bn |
| 10. Kabupaten BangkaKepulauan Bangka Belitung · tin | 1,046 ha | Rp 62.9 bn |
| 11. Kabupaten Belitung TimurKepulauan Bangka Belitung · tin | 826 ha | Rp 61.5 bn |
| 12. Kabupaten Kutai BaratKalimantan Timur · coal | 693 ha | Rp 48.8 bn |
| 13. Kabupaten Seram Bagian TimurMaluku · commodity unknown | 364 ha | Rp 46.6 bn |
| 14. Kabupaten Maluku TengahMaluku · quarry | 303 ha | Rp 46.5 bn |
| 15. Kabupaten Tanah BumbuKalimantan Selatan · coal | 1,067 ha | Rp 41.1 bn |
By gain per rupiah of cost
Net gain (P50) divided by the restoration cost (P50). Only kabupaten with at least 25 ha of land counted.
| Kabupaten | Land | Gain per rupiah | Net gain |
|---|---|---|---|
| 1. Kabupaten NatunaKepulauan Riau · quarry | 185 ha | 3.53× | Rp 31.9 bn |
| 2. Kabupaten SeruyanKalimantan Tengah · quarry | 190 ha | 3.4× | Rp 31.4 bn |
| 3. Kota BatamKepulauan Riau · quarry | 1,416 ha | 3.29× | Rp 230 bn |
| 4. Kabupaten Timor Tengah SelatanNusa Tenggara Timur · quarry | 58 ha | 3.24× | Rp 9.12 bn |
| 5. Kabupaten KaroSumatera Utara · quarry | 31 ha | 3.22× | Rp 4.82 bn |
| 6. Kota PalangkarayaKalimantan Tengah · quarry | 86 ha | 3.16× | Rp 13.3 bn |
| 7. Kabupaten Maluku TengahMaluku · quarry | 303 ha | 3.13× | Rp 46.5 bn |
| 8. Kabupaten BengkalisRiau · quarry | 172 ha | 3.03× | Rp 25.8 bn |
| 9. Kabupaten GowaSulawesi Selatan · quarry | 43 ha | 2.82× | Rp 6.06 bn |
| 10. Kabupaten SiakRiau · quarry | 119 ha | 2.78× | Rp 16.5 bn |
| 11. Kabupaten Halmahera TimurMaluku Utara · nickel | 45 ha | 2.56× | Rp 10.4 bn |
| 12. Kabupaten PosoSulawesi Tengah · quarry | 33 ha | 2.45× | Rp 4.08 bn |
| 13. Kabupaten Teluk BintuniPapua Barat · coal | 51 ha | 2.28× | Rp 7.77 bn |
| 14. Kabupaten PaserKalimantan Timur · coal | 183 ha | 2.08× | Rp 25.2 bn |
| 15. Kota BontangKalimantan Timur · commodity unknown | 26 ha | 1.84× | Rp 3.99 bn |
By net gain
| Kabupaten | Land | Net gain |
|---|---|---|
| 1. Kabupaten Kutai KartanegaraKalimantan Timur · coal | 2,583 ha | Rp 165 bn |
| 2. Kabupaten Kotawaringin TimurKalimantan Tengah · iron ore | 1,006 ha | Rp 120 bn |
| 3. Kabupaten Kutai TimurKalimantan Timur · coal | 2,233 ha | Rp 106 bn |
| 4. Kabupaten Tanah BumbuKalimantan Selatan · coal | 1,350 ha | Rp 54.7 bn |
| 5. Kabupaten Kutai BaratKalimantan Timur · coal | 936 ha | Rp 52.8 bn |
| 6. Kota SamarindaKalimantan Timur · coal | 559 ha | Rp 36.8 bn |
| 7. Kabupaten BerauKalimantan Timur · coal | 609 ha | Rp 32.2 bn |
| 8. Kabupaten Belitung TimurKepulauan Bangka Belitung · tin | 554 ha | Rp 29.8 bn |
| 9. Kabupaten BulunganKalimantan Utara · coal | 246 ha | Rp 20 bn |
| 10. Kabupaten Gunung MasKalimantan Tengah · coal | 1,083 ha | Rp 19.9 bn |
| 11. Kabupaten PaserKalimantan Timur · coal | 151 ha | Rp 18.6 bn |
| 12. Kabupaten GresikJawa Timur · quarry | 101 ha | Rp 15.5 bn |
| 13. Kabupaten KotabaruKalimantan Selatan · coal | 747 ha | Rp 13.6 bn |
| 14. Kabupaten KapuasKalimantan Tengah · coal | 513 ha | Rp 12.7 bn |
| 15. Kabupaten Murung RayaKalimantan Tengah · coal | 202 ha | Rp 9.98 bn |
By gain per rupiah of cost
Net gain (P50) divided by the restoration cost (P50). Only kabupaten with at least 25 ha of land counted.
| Kabupaten | Land | Gain per rupiah | Net gain |
|---|---|---|---|
| 1. Kabupaten SeruyanKalimantan Tengah · quarry | 28 ha | 3.4× | Rp 4.69 bn |
| 2. Kabupaten GresikJawa Timur · quarry | 101 ha | 3.1× | Rp 15.5 bn |
| 3. Kabupaten PaserKalimantan Timur · coal | 151 ha | 1.87× | Rp 18.6 bn |
| 4. Kabupaten Penajam Paser UtaraKalimantan Timur · coal | 42 ha | 1.53× | Rp 4.16 bn |
| 5. Kota BanjarbaruKalimantan Selatan · quarry | 91 ha | 1.45× | Rp 6.87 bn |
| 6. Kabupaten Kotawaringin TimurKalimantan Tengah · iron ore | 1,006 ha | 1.42× | Rp 120 bn |
| 7. Kota SawahluntoSumatera Barat · coal | 51 ha | 1.25× | Rp 4.18 bn |
| 8. Kabupaten BulunganKalimantan Utara · coal | 246 ha | 1.24× | Rp 20 bn |
| 9. Kota SamarindaKalimantan Timur · coal | 559 ha | 1.02× | Rp 36.8 bn |
| 10. Kabupaten Kutai KartanegaraKalimantan Timur · coal | 2,583 ha | 0.99× | Rp 165 bn |
| 11. Kabupaten Barito TimurKalimantan Tengah · coal | 99 ha | 0.98× | Rp 6.35 bn |
| 12. Kabupaten Kutai BaratKalimantan Timur · coal | 936 ha | 0.88× | Rp 52.8 bn |
| 13. Kabupaten BerauKalimantan Timur · coal | 609 ha | 0.82× | Rp 32.2 bn |
| 14. Kabupaten Belitung TimurKepulauan Bangka Belitung · tin | 554 ha | 0.76× | Rp 29.8 bn |
| 15. Kabupaten Murung RayaKalimantan Tengah · coal | 202 ha | 0.76× | Rp 9.98 bn |
Who benefits
MapBiomas mining-class measure
How the benefits are shared, before costs (median path). Benefit-sharing defaults from the Restoration Studio: 80 % cooperative, 20 % village fund.
- LandownerThe gain in land value.Rp 1.88 tn34 %
- CooperativePlan income above the land value and the community share of carbon (80 % stays in the cooperative).Rp 623 bn11 %
- Village fund20 % of the community share goes to the village fund.Rp 156 bn3 %
- Government and the publicEcosystem services and avoided downstream impacts.Rp 2.76 tn50 %
- Project developerThe rest of the carbon value.Rp 66.8 bn1 %
Footprint measure
How the benefits are shared, before costs (median path). Benefit-sharing defaults from the Restoration Studio: 80 % cooperative, 20 % village fund.
- LandownerThe gain in land value.Rp 839 bn42 %
- CooperativePlan income above the land value and the community share of carbon (80 % stays in the cooperative).Rp 147 bn7 %
- Village fund20 % of the community share goes to the village fund.Rp 36.8 bn2 %
- Government and the publicEcosystem services and avoided downstream impacts.Rp 959 bn48 %
- Project developerThe rest of the carbon value.Rp 16 bn1 %
Every part of the balance, with source and grade
National totals. Parts marked “model value” are modelled, not measured.
From value now to net gain
Value now → value after restoration, plus what restoration adds for everyone, minus the costs, gives the net gain.
- Value now (degraded land)model value−Rp 4.02 tn
- Value after restorationmodel valueRp 3.73 tn
The value now is negative: the land is worth less than nothing until it is reclaimed. That is shown but not counted as gain; the restoration costs are counted instead.
- Gain in land valuemodel valueRp 2.61 tn
- Ecosystem servicesmodel valueRp 2.18 tn
- CarbonRp 153 bn
- Avoided downstream impactsmodel valueRp 598 bn
- Restoration costsRp 2.97 tn
- RemediationRp 1.86 tn
- PlantingRp 883 bn
- Net gainmodel valueRp 2.61 tn
Shown, not added
- Plan income (capitalised)model valueRp 2.32 tn
- Reclamation duty dischargedRp 7.43 tn
Source and grade of every part
| Part | Value (P50) | Source |
|---|---|---|
| Value now (degraded land)model valueToday's use value of the degraded land: comparable land value minus the cost of reclamation. It can be negative. A negative value is shown but not counted as gain, because the restoration costs are counted below. | −Rp 4.02 tn | Eco Mining Data land value: degraded mining land = comparable value − reclamation cost (model value, not floored at zero) |
| Value after restorationmodel valueThe larger of the comparable land value and the capitalised plan income, never both. | Rp 3.73 tn | The larger of (b) the comparable land value (agriculture/plantation; pit lakes × water factor) and (a) the capitalised plan income |
| Plan income (capitalised)model valueIncome of a default restoration plan (forest, agroforestry, cassava fields, fish cages in pit lakes) over 25 years, discounted. Used in the value after restoration only when it is the larger of the two. | Rp 2.32 tn | Restoration Studio option economics (Sulawesi Utara price table applied nationally), default plan mix per commodity; present value of operating income over the plan period |
| Gain in land valuemodel valueValue after restoration minus today's use value (a negative value now counts as zero). | Rp 2.61 tn | (value after − today's use value, a negative value counted as 0), realised in year 2 and discounted |
| Ecosystem servicesmodel valueNon-market value of the restored land, such as water regulation and habitat (benefit transfer from de Groot et al. 2012). | Rp 2.18 tn | de Groot, R. et al. 2012. Global estimates of the value of ecosystems and their services in monetary units. Ecosystem Services 1: 50-61 (biome means). Benefits transferred at 0.25-1× the mean (most likely 0.5). Cultivated land: no extra non-market value counted. |
| CarbonCarbon credits from replanting, after buffer, leakage and uncertainty deductions, at a placeholder price. | Rp 153 bn | Restoration Studio carbon profiles × (1 − buffer − leakage − uncertainty) × carbon price, minus measurement and issuance costs |
| Avoided downstream impactsmodel valueAvoided sediment, flooding and water-treatment costs downstream. A model value, not a measurement. | Rp 598 bn | MODEL value: avoided sediment, flooding and water-treatment costs downstream of restored mining land, Rp/ha/yr. No Indonesian per-hectare study found; ESMI assumption, to be replaced by causal estimates. |
| RemediationRegrading, soil and water testing, labour, and POCO compost with microbes where metals are expected. | Rp 1.86 tn | Restoration Studio remediation costs: regrading, XRF and lab sampling, labour, POCO + microbes on the share of land with metals |
| PlantingSeedlings, compost and planting for the plan mix. | Rp 883 bn | Restoration Studio option costs (planting, seedlings, compost) of the plan mix |
| Restoration costsRemediation and planting, plus a contingency. | Rp 2.97 tn | Remediation + planting + contingency |
| Reclamation duty dischargedThe reclamation duty that restoration would discharge. It is a transfer between parties (who pays): shown, not added to the gain. | Rp 7.43 tn | Reclamation standard (Kepmen ESDM 344.K/MB.01/MEM.B/2025, IKK-adjusted): the duty restoration discharges. A TRANSFER (who pays), not added to the gain |
| Net gainmodel valueGain in land value + ecosystem services + carbon + avoided downstream impacts − restoration costs. | Rp 2.61 tn | Net gain = (value after − today's use value) + ecosystem services + carbon + avoided downstream impacts − costs; present value, model estimate, not an appraisal |
From value now to net gain
Value now → value after restoration, plus what restoration adds for everyone, minus the costs, gives the net gain.
- Value now (degraded land)model value−Rp 1.74 tn
- Value after restorationmodel valueRp 1.32 tn
The value now is negative: the land is worth less than nothing until it is reclaimed. That is shown but not counted as gain; the restoration costs are counted instead.
- Gain in land valuemodel valueRp 831 bn
- Ecosystem servicesmodel valueRp 702 bn
- CarbonRp 30.2 bn
- Avoided downstream impactsmodel valueRp 262 bn
- Restoration costsRp 1.11 tn
- RemediationRp 550 bn
- PlantingRp 480 bn
- Net gainmodel valueRp 724 bn
Shown, not added
- Plan income (capitalised)model valueRp 606 bn
- Reclamation duty dischargedRp 3.47 tn
Source and grade of every part
| Part | Value (P50) | Source |
|---|---|---|
| Value now (degraded land)model valueToday's use value of the degraded land: comparable land value minus the cost of reclamation. It can be negative. A negative value is shown but not counted as gain, because the restoration costs are counted below. | −Rp 1.74 tn | Eco Mining Data land value: degraded mining land = comparable value − reclamation cost (model value, not floored at zero) |
| Value after restorationmodel valueThe larger of the comparable land value and the capitalised plan income, never both. | Rp 1.32 tn | The larger of (b) the comparable land value (agriculture/plantation; pit lakes × water factor) and (a) the capitalised plan income |
| Plan income (capitalised)model valueIncome of a default restoration plan (forest, agroforestry, cassava fields, fish cages in pit lakes) over 25 years, discounted. Used in the value after restoration only when it is the larger of the two. | Rp 606 bn | Restoration Studio option economics (Sulawesi Utara price table applied nationally), default plan mix per commodity; present value of operating income over the plan period |
| Gain in land valuemodel valueValue after restoration minus today's use value (a negative value now counts as zero). | Rp 831 bn | (value after − today's use value, a negative value counted as 0), realised in year 2 and discounted |
| Ecosystem servicesmodel valueNon-market value of the restored land, such as water regulation and habitat (benefit transfer from de Groot et al. 2012). | Rp 702 bn | de Groot, R. et al. 2012. Global estimates of the value of ecosystems and their services in monetary units. Ecosystem Services 1: 50-61 (biome means). Benefits transferred at 0.25-1× the mean (most likely 0.5). Cultivated land: no extra non-market value counted. |
| CarbonCarbon credits from replanting, after buffer, leakage and uncertainty deductions, at a placeholder price. | Rp 30.2 bn | Restoration Studio carbon profiles × (1 − buffer − leakage − uncertainty) × carbon price, minus measurement and issuance costs |
| Avoided downstream impactsmodel valueAvoided sediment, flooding and water-treatment costs downstream. A model value, not a measurement. | Rp 262 bn | MODEL value: avoided sediment, flooding and water-treatment costs downstream of restored mining land, Rp/ha/yr. No Indonesian per-hectare study found; ESMI assumption, to be replaced by causal estimates. |
| RemediationRegrading, soil and water testing, labour, and POCO compost with microbes where metals are expected. | Rp 550 bn | Restoration Studio remediation costs: regrading, XRF and lab sampling, labour, POCO + microbes on the share of land with metals |
| PlantingSeedlings, compost and planting for the plan mix. | Rp 480 bn | Restoration Studio option costs (planting, seedlings, compost) of the plan mix |
| Restoration costsRemediation and planting, plus a contingency. | Rp 1.11 tn | Remediation + planting + contingency |
| Reclamation duty dischargedThe reclamation duty that restoration would discharge. It is a transfer between parties (who pays): shown, not added to the gain. | Rp 3.47 tn | Reclamation standard (Kepmen ESDM 344.K/MB.01/MEM.B/2025, IKK-adjusted): the duty restoration discharges. A TRANSFER (who pays), not added to the gain |
| Net gainmodel valueGain in land value + ecosystem services + carbon + avoided downstream impacts − restoration costs. | Rp 724 bn | Net gain = (value after − today's use value) + ecosystem services + carbon + avoided downstream impacts − costs; present value, model estimate, not an appraisal |
What this is and what it is not
- A model estimate per kabupaten, with a P10–P90 range from Monte Carlo draws. Not an appraisal, not a valuation of any plot, and not an offer.
- Land values come from the Eco Mining Data land-value model (grade D or C): comparable land prices per kabupaten, with fallbacks to the province or region where local data are missing.
- Plan income uses the price table of the Restoration Studio for Sulawesi Utara, applied to the whole country.
- Ecosystem services use benefit transfer from global biome means (de Groot et al. 2012), scaled down; they are not measured on site.
- The carbon price is a placeholder within the current voluntary-market range; no credits exist for this land.
- Avoided downstream impacts are a model value. No Indonesian per-hectare study was found; it will be replaced by measured estimates.
- There are no site plans: every kabupaten gets a default plan mix by commodity (more forest on steep nickel and gold land, more agroforestry and cassava fields on flat tin and quarry land, wetland and some fish cages on pit lakes).
- The gain is measured from today's use value. A negative value now (the reclamation liability) is shown but not counted as gain, because the restoration costs are counted.
- The reclamation duty discharged is a transfer between parties: shown, never added to the gain.
- Footprint measure: mapped mining polygons. MapBiomas mining-class measure: every pixel ever labelled mining pit. They overlap and are never summed.
- “Outside known permit boundaries (ESDM)” can be a gap in the permit layer or an older permit. It says nothing about who is responsible.
Project 2050: this page is data only. It is not a business plan or an investment proposal.